Limón, Costa Rica

Quantum AI
Free Zone
Campus

200 MW Renewable-Powered AI Infrastructure Platform

A next-generation AI data center campus designed to deliver hyperscale compute capacity with dedicated power, water, cooling, carrier-neutral connectivity, secure operations, and Free Zone economic advantages.

Quantum AI Free Zone Campus

200MW IT / AI Capacity
42Hectare Site Area
7AI Data Centers
0%Corporate Income Tax


200 MW

IT / AI Capacity
Total campus power

42 ha

Site Area
Total developable land

7

AI Data Centers
DC1 through DC7

3

Dev Phases
50 MW to 200 MW

230 kV

On-Site Substation
Dedicated power infrastructure


The Americas’ Premier Renewable-Powered AI Campus

Quantum AI Free Zone Campus is a proposed next-generation AI infrastructure platform located within Quantum Free Zone in Limón, Costa Rica. Designed from the ground up for high-density AI workloads, the campus delivers up to 200 MW of compute capacity across seven purpose-built data center buildings on an approximately 42-hectare site.

The project’s Free Zone location is a major strategic and economic differentiator. Companies operating within the campus can benefit from tax-free imports of servers, GPUs, cooling systems, and electrical infrastructure, combined with exemptions from corporate income tax, property tax, and VAT during the applicable incentive period.

  • Seven AI data center buildings: DC1 through DC7
  • Dedicated 230 kV on-site substation up to 200 MW
  • Renewable power with thermal backup
  • AI-optimized cooling and water infrastructure
  • Carrier-neutral fiber connectivity zone
  • Tax-free imports, zero corporate income tax during incentive period

Quantum AI Free Zone Campus Master Plan

Master Plan — AI Data Center Campus  |  Limón, Costa Rica


Three Pillars of a Differentiated Platform

Quantum AI Free Zone Campus is built on a combination of infrastructure quality, economic structure, and geographic positioning that purpose-built data center campuses in conventional taxable environments cannot replicate.

AI Data Center Server Hall

AI-Optimized Infrastructure

A 230 kV dedicated substation, two AI-optimized cooling plants, 350 L/s of water supply, and a carrier-neutral fiber zone — all designed at full 200 MW scale from day one, supporting GPU clusters, liquid cooling, and N+1 redundancy from Phase 1 through full campus buildout.

200 MW

Costa Rica Free Zone Business Hub
💼

Free Zone Economics

As a designated Free Zone campus, operators benefit from zero corporate income tax during the applicable incentive period, duty-free importation of servers, GPUs, cooling and electrical equipment, VAT exemption on qualifying local purchases, and real estate and municipal tax exemptions — dramatically reducing the total cost of ownership.

0% Tax



Where AI Demand Meets Central American Advantage

The global demand for AI compute infrastructure is growing at an unprecedented pace. Hyperscale AI training, GPU cloud services, and sovereign compute programs require purpose-built environments that combine power density, water availability, network connectivity, and economic efficiency at scale.

Quantum AI Free Zone Campus is designed to meet that demand — delivering a platform where the economics of Free Zone operations, the availability of renewable power, and the proximity to the Americas’ logistics network create a unique and compelling combination for AI data center operators evaluating deployments beyond North America and Western Europe.

With further engineering, utility coordination, fiber validation, water studies, environmental review, and tenant-specific design, the campus has the potential to become a leading AI infrastructure platform in Central America and a strategic compute gateway for the Americas.

200 MW
Scalable AI-Ready Capacity

Phase 1 delivers 50 MW. Full campus buildout reaches 200 MW across seven data center buildings — all on a single 42-hectare site in Limón, Costa Rica.

3
Dev Phases

 

5
Infra Pillars

 

8
Tax Benefits

 

99%+
Renewable Power

 

AI GPU Compute Infrastructure


[/vc_column_text][/vc_column][/vc_row]
Limón, Costa Rica

Quantum AI
Free Zone
Campus

200 MW Renewable-Powered AI Infrastructure Platform

A next-generation AI data center campus designed to deliver hyperscale compute capacity with dedicated power, water, cooling, carrier-neutral connectivity, secure operations, and Free Zone economic advantages.

Quantum AI Free Zone Campus

200MW IT / AI Capacity
42Hectare Site Area
7AI Data Centers
0%Corporate Income Tax

200 MW

IT / AI Capacity
Total campus power

42 ha

Site Area
Total developable land

7

AI Data Centers
DC1 through DC7

3

Dev Phases
50 MW to 200 MW

230 kV

On-Site Substation
Dedicated power infrastructure

The Americas’ Premier Renewable-Powered AI Campus

Quantum AI Free Zone Campus is a proposed next-generation AI infrastructure platform located within Quantum Free Zone in Limón, Costa Rica. Designed from the ground up for high-density AI workloads, the campus delivers up to 200 MW of compute capacity across seven purpose-built data center buildings on an approximately 42-hectare site.

The project’s Free Zone location is a major strategic and economic differentiator. Companies operating within the campus can benefit from tax-free imports of servers, GPUs, cooling systems, and electrical infrastructure, combined with exemptions from corporate income tax, property tax, and VAT during the applicable incentive period.

  • Seven AI data center buildings: DC1 through DC7
  • Dedicated 230 kV on-site substation up to 200 MW
  • Renewable power with thermal backup
  • AI-optimized cooling and water infrastructure
  • Carrier-neutral fiber connectivity zone
  • Tax-free imports, zero corporate income tax during incentive period
Quantum AI Free Zone Campus Master Plan

Master Plan — AI Data Center Campus  |  Limón, Costa Rica

Three Pillars of a Differentiated Platform

Quantum AI Free Zone Campus is built on a combination of infrastructure quality, economic structure, and geographic positioning that purpose-built data center campuses in conventional taxable environments cannot replicate.

AI Data Center Server Hall

AI-Optimized Infrastructure

A 230 kV dedicated substation, two AI-optimized cooling plants, 350 L/s of water supply, and a carrier-neutral fiber zone — all designed at full 200 MW scale from day one, supporting GPU clusters, liquid cooling, and N+1 redundancy from Phase 1 through full campus buildout.

200 MW

Costa Rica Free Zone Business Hub
💼

Free Zone Economics

As a designated Free Zone campus, operators benefit from zero corporate income tax during the applicable incentive period, duty-free importation of servers, GPUs, cooling and electrical equipment, VAT exemption on qualifying local purchases, and real estate and municipal tax exemptions — dramatically reducing the total cost of ownership.

0% Tax

Where AI Demand Meets Central American Advantage

The global demand for AI compute infrastructure is growing at an unprecedented pace. Hyperscale AI training, GPU cloud services, and sovereign compute programs require purpose-built environments that combine power density, water availability, network connectivity, and economic efficiency at scale.

Quantum AI Free Zone Campus is designed to meet that demand — delivering a platform where the economics of Free Zone operations, the availability of renewable power, and the proximity to the Americas’ logistics network create a unique and compelling combination for AI data center operators evaluating deployments beyond North America and Western Europe.

With further engineering, utility coordination, fiber validation, water studies, environmental review, and tenant-specific design, the campus has the potential to become a leading AI infrastructure platform in Central America and a strategic compute gateway for the Americas.

200 MW
Scalable AI-Ready Capacity

Phase 1 delivers 50 MW. Full campus buildout reaches 200 MW across seven data center buildings — all on a single 42-hectare site in Limón, Costa Rica.

3
Dev Phases

 

5
Infra Pillars

 

8
Tax Benefits

 

99%+
Renewable Power

 

AI GPU Compute Infrastructure